Pipeline Station Electrical Distribution and Control Centers

About The Project

Arseal provided engineering, design, material specification, procurement support and construction support for three prefabricated electrical equipment centers for the control of pipeline pumping equipment consisting of:

  • Five 4,000HP+ mainline pumps
  • Four 800HP+ booster pumps
  • Two Metal Clad switchgear lineups
  • Fifteen Protective Relays
  • Five Variable Frequency Drives
  • Four Reduced Voltage Starters
  • Two Motor Control Centers
  • Seven PLC control cabinets
  • Three UPS systems

Project Details

Location: East Houston, Texas

Client: Magellan Midstream Partners, L.P.

Project Contact

Paul Malone
Manager, Electrical Engineering
(470) 246-4059