SITE DEVELOPMENT

Arseal has experience with large scale site development from beginning to end. We have know-how to optimize land use and set up a working infrastructure. We have developed full designs establishing grading, drainage, stormwater collection, and erosion control measures according to local and state wide requirements.

Tank Farm and Pump Station Site Development

Arseal provided initial site planning input and site layouts (both preliminary and more advanced) for a large oil and gas terminal facility to be located in northern Colorado. Arseal was involved each step of the way, including during grading and construction of the site, and successfully oversaw the transformation of the site from vacant grasslands to a fully-functioning facility, all in accordance with governing codes and practices.

Project Details

Location: Platteville, Colorado

Client: Magellan Midstream Partners, L.P.

Project Contact

Chris Tyler, PE
Manager, Civil/Structural Engineering
(470) 246-4030