Crane Hydrology and Hydraulics

About The Project

Arseal provided hydrology/stormwater design and analysis, as well as grading construction drawings and earthwork calculations, for an approximately 57-acre terminal site, including the design of a retention pond capable of holding 40,0000+ CY of stormwater runoff.

Project Details

Location: Crane, Texas

Client: Epic Crude Terminal Company LP

Project Contact

Chris Tyler, PE
Manager, Civil/Structural Engineering
(470) 246-4030