Project Description
Horizontal Direction Drill Design
About The Project
Design for connecting two facilities via traditional pipe routing in combination with a horizontal direction drill. Route required two separate drills to be designed and combined. The first drill required a lateral change in direction. Design drawings were completed to accomplish successful permitting and installation of the line.
Related Applications
- Crude Oil Facility Expansion Design
- Crude and Condensate Pipeline
- Pipeline Facilities Design
- Nitrogen Supply Cabinet
- Pump Station Equipment Specification
- Horizontal Direction Drill Design
- Fuel Terminal Hydraulic Modeling and Optimization
- Pipe Stress Analysis
- Piping Manifold Expansion
- Facility P&ID Updates
Related Applications
- Facility P&ID Updates