Pump Station Control System Upgrades
About The Project
As part of a multi-year, multi-location turnkey project, Arseal was tasked with replacing legacy PLC control systems with the latest customer standard control system for multiple pumping stations. The project involved the design of new control panels, both stand-alone cabinets and retro-fitted panels, and the programming and testing of those panels. Arseal performed factory acceptance testing of the control panel hardware and wiring and of the program functionality at the customer’s SCADA location prior to commissioning. Arseal also developed detailed drawing packages for the removal of the legacy systems and installation of the new control systems. During commissioning, Arseal provided engineering support, performed local functionality testing, and final point-to-point and loop testing with the remote control center.